Ident. Num:
GID 1410-1
GID 1410-1, High Priority Configuration Management Changes to GPR 1410.2. This Goddard Interim Directive (GID) expedites the implementation of the high-priority recommendations of the Goddard Space Flight Center (GSFC) Configuration Management (CM) Process Evaluation Team. These recommendations correct shortcomings in GSFC configuration management procedures and address the relevant CM factors cited in the Genesis Mishap Investigation Board Report. This GID applies to all flight projects, suborbital projects, and supporting ground systems at alllocations at GSFC.
Ident. Num:
GPR 1280.1
Rev. Num:
-
GPR 1280.1, THE GSFC QUALITY MANUAL, The purpose of the GSFC Quality Manual is to define the Management System (MS) as implemented at the Goddard Space Flight Center (GSFC) at Greenbelt, Maryland, and at Wallops Flight Facility (WFF), Wallops Island, Virginia.
Ident. Num:
GPR 2800.1
Rev. Num:
-
GPR 2800, GSFC SECTION 508 WEB COMPLIANCE.This directive describes the responsibilities and processes for ensuring GSFC Web site and Web application compliance with Section 508 of the Rehabilitation Act (29 U.S.C. 794d). Section 508 requires federal agencies to make their electronic and information technology accessible to people with disabilities, and to give both disabled employees, and members of the public with disabilities, access to information that is comparable to the access available to others.
Ident. Num:
GPR 3600.1
Rev. Num:
A
GPR 3600.1A, WORK SCHEDULES.This directive describes the work schedule options available to employees of the Goddard Space Flight
Center (GSFC) and the requirements and procedures to be followed by supervisors and employees for
establishing individual tours of duty.
Ident. Num:
GPR 7120-5
Rev. Num:
A
This directive outlines a process for the systems engineering of Goddard Space Flight Center (GSFC) Missions. The intent is to outline a set of requirements that provide a consistent method for performing systems engineering across GSFC projects. The requirements for system engineering outlined in this directive are universal principles that, when followed, should result in sound systems.
Ident. Num:
GPR 7120.3
Rev. Num:
B
Goddard Procedural Requirements (GPR) GPR 7120.3B, Management of Principal Investigator Mode Missions. This directive describes the roles and responsibilities of the Principal Investigator (PI), the program office, the implementing organization, and NASA Headquarters (HQ) with respect to the overall management of PI-mode missions at the Goddard Space Flight Center (GSFC). These guidelines are consistent with NPR 7120.5, NASA Program and Project Management Processes and Requirements, which allows for tailoring of requirements according to mission size, complexity, criticality, and risk
Ident. Num:
GPR 8070.4
Rev. Num:
A
GPR 8070.4A, Administration and Application of Goddard Rules for the Design, Development, Verification and Operation of Flight Systems. This directive defines the process for the administration and application of the Goddard Rules for the Design, Development, Verification and Operation of Flight Systems. This includes the control of changes, compliance verification and deviation/waiver management.
Ident. Num:
8719.1
Rev. Num:
-
GPR 8719.1, CERTIFICATION AND RECERTIFICATION OF LIFTING DEVICES AND EQUIPMENT. This directive establishes the requirements for the Goddard Recertification Program (RECERT) to
provide Center organizations with inspection, certification, recertification, and consultation of lifting
devices and equipment (LDE), mobile aerial platforms (MAP), powered industrial trucks (PIT), and
critical jacks (collectively, MPJ). LDE Operator, Critical Lift Coordinator (CLC), and MPJ Operator training and certification requirements are also established. This Center program improves safety, and
minimizes or prevents potential personnel injury or fatality, or damage to, or loss of, hardware and
facilities.
This directive is not a substitute for applicable Occupational Safety and Health Administration (OSHA)
requirements. OSHA requirements apply to all GSFC lifting operations.
Ident. Num:
GPR 8730.6
This document establishes a GSFC Electrostatic Discharge (ESD) control program that complies with ANSI/ESD S20.20-1999.
Ident. Num:
8834.1
Rev. Num:
-
GPR 8834.1, LIFTING OPERATIONS REQUIREMENTS. The purpose of this GPR is to define the process, requirements, and responsibilities for conducting safe
lifting operations at Goddard Space Flight Center (GSFC) and at applicable contractor sites.