DI-QCIC-80107, QUALITY PROGRAM PLANIdent. Num:
DI-QCIC-80107
Rev. Num:
-
DI-QCIC-80107, QUALITY PROGRAM PLAN., This plan describes the program to be utilized by the Operations and Maintenance (O&M) contractor to fulfill the statement of work quality program requirements.
DI-QCIC-80798B, CALIBRATION CERTIFICATEIdent. Num:
DI-QCIC-80798
Rev. Num:
B
DI-QCIC-80798B, CALIBRATION CERTIFICATE, This Data Item Description (DID) contains the format and content requirements for calibration
reports or certificates accompanying calibrations performed on DoD test, measurement, and
diagnostic equipment.
This DID is applicable to contracts requiring calibration of test equipment prior to delivery. This
DID is consistent with ISO 17025 requirements for calibration reports or certificate.
This DID supersedes DI-QCIC-80798A.
DI-QCIC-80815, SUBMARINE SAFETY / MATERIAL CERTIFICATION COMPOSITE LISTSIdent. Num:
DI-QCIC-80815
Rev. Num:
-
DI-QCIC-80815, SUBMARINE SAFETY / MATERIAL CERTIFICATION COMPOSITE LISTS., These lists with Submarine Safety and Material Certification Mapping Drawings are used to provide positive evidence to a NAVSEA certification Audit Team that all work required for certification has been accomplished.
DI-QCIC-80906, CALIBRATION SYSTEM DESCRIPTIONIdent. Num:
DI-QCIC-80906
Rev. Num:
-
DI-QCIC-80906, CALIBRATION SYSTEM DESCRIPTION, The Calibration System Description defines the contractor's system for the calibration of all measuring and test equipment used in fulfilling contractual requirements.
DI-QCIC-81007, SPECIAL INSPECTION EQUIPMENT CALIBRATION PROCEDURESIdent. Num:
DI-QCIC-81007
Rev. Num:
-
DI-QCIC-81007, SPECIAL INSPECTION EQUIPMENT CALIBRATION PROCEDURES, A Special Inspection Equipment Calibration Procedure (CP) describes the requirements and procedures for calibrating special inspection or special test equipment (SIE) as individual pieces of equipment or as a system or group of equipments.
DI-QCIC-81013, TECHNICAL DATA PACKAGE VALIDATION REPORT Ident. Num:
DI-QCIC-81013
Rev. Num:
-
DI-QCIC-81013, TECHNICAL DATA PACKAGE (TDP) VALIDATION REPORT. A Technical Data Package (TDP) Validation Report provides information on the procedures and results of TDP validations preformed by the Contractor.
DI-QCIC-81068, END ITEM FINAL INSPECTION RECORD (FIR)Ident. Num:
DI-QCIC-81068
Rev. Num:
-
DI-QCIC-81068, END ITEM FINAL INSPECTION RECORD (FIR)., Establishes and classifies quality characteristic for final examination and functional testing of major end item and components. Serves as a permanent record of final inspection results.
DI-QCIC-81110, INSPECTION AND TEST PLANIdent. Num:
DI-QCIC-81110
DI-QCIC-81110, INSPECTION AND TEST PLAN. The plan will document the details of the inspection system, tests, and inspections to be performed on the product being procured.