DI-NDTI-80492A, INTEGRATED CIRCUIT PRODUCTION TEST REPORT (21 NOV 2006)Ident. Num:
DI-NDTI-80492
Rev. Num:
A
DI-NDTI-80492A, INTEGRATED CIRCUIT PRODUCTION TEST REPORT (21 NOV 2006)., The Production Test report provides information which is used to assess any problem areas in production and to evaluate any recommendations for change in processing and Testing that could result in a better product
DI-NDTI-80566, TEST PLANIdent. Num:
DI-NDTI-80566
Rev. Num:
-
DI-NDTI-80566, TEST PLAN., The test plan outlines the plans and performance objectives at every level of testing on systems or equipment.
DI-NDTI-80603, TEST PROCEDUREIdent. Num:
DI-NDTI-80603
Rev. Num:
-
DI-NDTI-80603, TEST PROCEDURE., The test procedure identifies the step-by-step testing operations to be performed on items undergoing developmental, qualification, or acceptance testing.
DI-NDTI-80603A, TEST PROCEDUREIdent. Num:
DI-NDTI-80603
Rev. Num:
A
DI-NDTI-80603A, TEST PROCEDURE. The test procedure identifies the step-by-step testing operations to be preformed on items under going developmental, qualification, or acceptance testing. It identifies items to be tested, the test equipment and support required, the test conditions to be imposed, the parameters to be measured, and the pass/fail criteria against which the test results will be measured. The document is a compilation of individual test procedures for related elements of a system, subsystem, or equipment.
This Data Item Description (DID) contains the format and content preparation instructions for each tech data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable to contracts requiring tests to be preformed for the purpose of developmental or environmental evaluation, acceptance testing, and item qualification testing.
DI-NDTI-80808, TEST PLANS/PROCEDURES (11 MAY 1989)Ident. Num:
DI-NDTI-80808
Rev. Num:
-
DI-NDTI-80808, TEST PLANS/PROCEDURES (11 MAY 1989)., The Test Plan shall include detailed planning information on each test specified in each of the specifications on the contract - i.e., System Specification, CI Specifications, Critical Component Specifications, Military Specifications, and other contractual documents that include test methods and success requirements.
DI-NDTI-80809B, TEST/INSPECTION REPORTIdent. Num:
DI-NDTI-80809
Rev. Num:
B
DI-NDTI-80809B, TEST/INSPECTION REPORT., The test/inspection report is used to document test/inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test/inspection plans.
DI-NDTI-80884, RANDOMIZER TEST REPORT (30 JAN 2008)Ident. Num:
DI-NDTI-80884
Rev. Num:
A
DI-NDTI-80884, RANDOMIZER TEST REPORT (30 JAN 2008)., The Randomizer Test Report provides the data necessary to evaluate and determine the effectiveness of randomizers incorporated into cryptographic products. Analysis of this report also provides a basis upon which equipment design improvement or refinement may be recommended
DI-NDTI-81284, TEST AND EVALUATION PROGRAM PLAN (TEPP) (11 SEP 1992) Ident. Num:
DI-NDTI-81284
Rev. Num:
-
DI-NDTI-81284, TEST AND EVALUATION PROGRAM PLAN (TEPP) (11 SEP 1992)., The TEPP describes the contractor's plan for conducting tests and analyzing the test results to show how the system will satisfy the requirements of the applicable design specification.
DI-NDTI-81583A, EQUIPMENT INSPECTION AND TESTING REPORT (21 NOV 2006)Ident. Num:
DI-NDTI-81583
Rev. Num:
A
DI-NDTI-81583A, EQUIPMENT INSPECTION AND TESTING REPORT (21 NOV 2006)., The Equipment Inspection and Testing Report contains the results of all equipment receiving acceptance inspection and testing and Environmental Stress Screening (ESS) and/or qualification testing.
DI-NDTI-81585A, RELIABILITY TEST PLAN (21 NOV 2006)Ident. Num:
DI-NDTI-81585
Rev. Num:
A
DI-NDTI-81585A, RELIABILITY TEST PLAN (21 NOV 2006)., This plan describes the overall reliability test planning and its total integrated test requirements. It delineates required reliability tests, their purpose and schedule. This
document will be used by the procuring activity for review, approval, and subsequent
surveillance and evaluation of the contractor’s reliability test program.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements for this data included in the contract.
DI-NDTI-81587A, VIBRATION SURVEY REPORT (21 NOV 2006)Ident. Num:
DI-NDTI-81587
Rev. Num:
A
DI-NDTI-81587A, VIBRATION SURVEY REPORT (21 NOV 2006)., This report covers the results of specified vibration surveys tests performed on equipment to determine if any resonant condition exists within the equipment, and also the magnitude of resulting acceleration forces as they relate to possible over stress of assemblies or components. The report will be used by the procuring activity to determine the readiness of the equipment for environment stress screening (ESS) and reliability tests.
DI-NUOR-81405, AIRCRAFT NUCLEAR SAFETY ANALYSIS REPORT (NSAR)Ident. Num:
DI-NUOR-81405
Rev. Num:
-
DI-NUOR-81405, AIRCRAFT NUCLEAR SAFETY ANALYSIS REPORT (NSAR)., This report is a comprehensive assessment of the safety design features and operational procedures of a nuclear weapon component, assembly, or system.